There are 4 scheduled backups on Ron daily, each four days and monthly.
The scheduled backups are set on my Mac, my Qnap NAS and the attached external drive to the NAS.
The backups start only if I force them.
Is there an error message in Roon why the backups didn’t run?
And the Core is running at the scheduled backup time (not sleeping), power save options turned off?
To perform the new scheduled backups my Core installed on my MarcBook Air M2 was running and power save option was turned off. But still the scheduled backups did not start either the one on my MacBook Air and the one on my Qnap NAS. I do not understand why it is not working!